On the river-side of Garden Highway, a concrete outfall structure now houses massive conveyance tubes that will discharge floodwaters from the Natomas side, up and under Garden Highway and into the Sacramento River.
Date Taken: | 06.18.2011 |
Date Posted: | 03.02.2022 15:37 |
Photo ID: | 7074956 |
VIRIN: | 220301-A-PZ119-0072 |
Resolution: | 2550x1650 |
Size: | 3.88 MB |
Location: | SACRAMENTO, CALIFORNIA, US |
Web Views: | 14 |
Downloads: | 3 |
This work, Reach B Progress [Image 4 of 4], by Joseph Bruton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.