Dirt now covers conveyance tubes that were recently cemented into place and buried, leaving only the vertical water pumps of Pumping Station 3 exposed and ready to help prevent the Natomas area from flooding during high water events.
Date Taken: | 02.10.2022 |
Date Posted: | 03.02.2022 15:38 |
Photo ID: | 7074963 |
VIRIN: | 220301-A-PZ119-0075 |
Resolution: | 1650x2550 |
Size: | 4.82 MB |
Location: | SACRAMENTO, CALIFORNIA, US |
Web Views: | 19 |
Downloads: | 4 |
This work, Reach B Progress [Image 4 of 4], by Joseph Bruton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.