Kittery, ME (June 6, 2022) – Cranes in the P-310 Superflood Basin prepare work platforms for construction activities in support of the P-381 Multi-Mission Dry Dock #1. In the foreground, drill rigs stand by to install drilled shafts for reinforcement at Berth 11.
Date Taken: | 04.03.2020 |
Date Posted: | 08.24.2022 15:05 |
Photo ID: | 7386374 |
VIRIN: | 200403-N-LI217-253 |
Resolution: | 1280x960 |
Size: | 324.52 KB |
Location: | KITTERY, MAINE, US |
Web Views: | 235 |
Downloads: | 5 |
This work, Drill Rigs at Berth 11 [Image 7 of 7], by LT Matthew Karny, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.