Airmen from the 386th Expeditionary Communications Squadron and U.S. Air Forces Central Command A 6/7 engineering and installation, prepare to cut a cable at Ali Al Salem Air Base, Kuwait, Nov. 1, 2022. In preparation for the construction, hundreds of cables were mapped out across the installation in advance in order to make sure which ones needed to be updated and to efficiently manage operations. (U.S. Air Force photo by Staff Sgt. Dalton Williams)
Date Taken: | 11.01.2022 |
Date Posted: | 11.09.2022 04:53 |
Photo ID: | 7504333 |
VIRIN: | 221101-F-DJ189-1302 |
Resolution: | 5722x3807 |
Size: | 3.34 MB |
Location: | ALI AL SALEM AIR BASE, KW |
Web Views: | 29 |
Downloads: | 6 |
This work, 386 ECS and AFCENT A 6/7 E&I bolster communication capabilities, enduring presence [Image 7 of 7], by SSgt Dalton Williams, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.