U.S. Air Force Tech. Sgt. Michael Perez, U.S. Air Forces Central Command A 6/7 engineering and installation team chief runs cable to his team to update a section of communication infrastructure at Ali Al Salem Air Base, Kuwait, Nov. 1, 2022. The A/6/7 team from Al Udeid Air Base, Qatar, were able to seamlessly hit the ground running and work alongside the Airmen from the 386th Expeditionary Communications Squadron in order to execute the mission. (U.S. Air Force photo by Staff Sgt. Dalton Williams)
Date Taken: | 11.01.2022 |
Date Posted: | 11.09.2022 04:53 |
Photo ID: | 7504335 |
VIRIN: | 221101-F-DJ189-1194 |
Resolution: | 5962x3967 |
Size: | 2.35 MB |
Location: | ALI AL SALEM AIR BASE, KW |
Web Views: | 33 |
Downloads: | 7 |
This work, 386 ECS and AFCENT A 6/7 E&I bolster communication capabilities, enduring presence [Image 7 of 7], by SSgt Dalton Williams, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.