Kittery, ME (November 23, 2022) - Staging to support the construction of 27 monoliths, each weighing nearly 4000 tons, which will be the base for OICC Portsmouth Naval Shipyard’s new dry docks as part of P381.
Date Taken: | 11.18.2022 |
Date Posted: | 11.23.2022 13:13 |
Photo ID: | 7526518 |
VIRIN: | 221118-O-DT551-548 |
Resolution: | 2995x2986 |
Size: | 1.99 MB |
Location: | KITTERY, MAINE, US |
Web Views: | 508 |
Downloads: | 7 |
This work, Multi-Mission Dry Dock #1 (P381) Pre-Cast Monolith Construction in Brewer, ME [Image 2 of 2], by Victoria Arel, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.