Kittery, ME (November 23, 2022) - Reinforcement of steel walls being erected for the first of the center wall monoliths in support of OICC Portsmouth Naval Shipyard’s Multi-Mission Dry Dock project, P381.
Date Taken: | 11.18.2022 |
Date Posted: | 11.23.2022 13:13 |
Photo ID: | 7526519 |
VIRIN: | 221118-O-DT551-847 |
Resolution: | 2989x2994 |
Size: | 2.19 MB |
Location: | KITTERY, MAINE, US |
Web Views: | 672 |
Downloads: | 6 |
This work, Multi-Mission Dry Dock #1 (P381) Pre-Cast Monolith Construction in Brewer, ME [Image 2 of 2], by Victoria Arel, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.