Repairs and fender replacement to the Port’s Docks 7 and 8 along the Stockton Deep-Water Ship Channel are seen in mid-construction following SPK Regulatory’ s confirmation in March 2022 of applicability under a non-reporting Nationwide Permit.
Date Taken: | 11.29.2022 |
Date Posted: | 12.29.2022 18:21 |
Photo ID: | 7575390 |
VIRIN: | 221209-A-PZ119-0045 |
Resolution: | 2250x1650 |
Size: | 2.6 MB |
Location: | SACRAMENTO, CALIFORNIA, US |
Web Views: | 13 |
Downloads: | 3 |
This work, Regulatory visits Port of Stockton [Image 8 of 8], by Joseph Bruton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.