An old, wooden dock utilized by the Port Police was replaced by a new floating dock with two boat-lift systems and a new ADA-compliant gangway. The project was authorized by SPK Regulatory in May 2022 and the project has been completed. The new dock supports enhanced safety and security functions at the Port.
Date Taken: | 11.30.2022 |
Date Posted: | 12.29.2022 18:21 |
Photo ID: | 7575392 |
VIRIN: | 221209-A-PZ119-0047 |
Resolution: | 2250x1680 |
Size: | 2.47 MB |
Location: | SACRAMENTO, CALIFORNIA, US |
Web Views: | 6 |
Downloads: | 3 |
This work, Regulatory visits Port of Stockton [Image 8 of 8], by Joseph Bruton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.