A rendering image of a pedestrian boardwalk to be installed as part of the restoration project at Ballinger Park, in the city of Mountlake Terrace, Washington. Along with the pedestrian boardwalk, the $5.5 million project includes replacing a vehicle crossing, both to ensure access and limit plant damage. USACE Seattle District's team of architects and structural engineers collaborated with the city of Montlake Terrace representatives to create renderings that accurately reflect the project's goals.
Date Taken: | 01.06.2023 |
Date Posted: | 01.11.2023 12:00 |
Photo ID: | 7580760 |
VIRIN: | 230106-A-VA654-930 |
Resolution: | 1691x1080 |
Size: | 1.69 MB |
Location: | MOUNTLAKE TERRACE, WASHINGTON, US |
Web Views: | 17 |
Downloads: | 3 |
This work, Corps awards $5.5 million contract toward Mountlake Terrace Lake Ballinger aquatic ecosystem restoration project [Image 8 of 8], by Nicole Celestine, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.