Wolf Pack leadership observe construction details on a laptop that 1st Lt. Rory Stimpson, 8th Civil Engineer Squadron officer in charge of construction management, is holding at Kunsan Air Base, Republic of Korea, April 4, 2023. The laptop exhibits an interactive construction map displaying the status of each slab that is being prepared. (U.S. Air Force photo by Senior Airman Akeem K. Campbell)
Date Taken: | 04.04.2023 |
Date Posted: | 04.06.2023 21:23 |
Photo ID: | 7722841 |
VIRIN: | 230404-F-RA633-1031 |
Resolution: | 6036x4024 |
Size: | 4.08 MB |
Location: | KUNSAN AIR BASE, BUSAN GWANG'YEOGSI [PUSAN-KWANGYOKSHI], KR |
Web Views: | 61 |
Downloads: | 3 |
This work, Kunsan begins runway repairs [Image 6 of 6], by SrA Akeem Campbell, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.