UPPER GALVESTON BAY, Texas (June 5, 2023) Jasper Schaer, Hydro Survey Team and technical lead, left, and Jason Hiroms, boat captain, right, both from the U.S. Army Corps of Engineers Galveston District, check an Aid to Navigation marker for a tide marker. Aids to Navigation sometimes get displaced by large ship traffic. It’s important for surveyors to have an accurate measure of water depth to precisely calculate how much material a dredge removes to complete a contract. U.S. Army photo by Luke Waack.
Date Taken: | 06.05.2023 |
Date Posted: | 06.12.2023 16:40 |
Photo ID: | 7850887 |
VIRIN: | 230605-A-XJ740-0009 |
Resolution: | 6720x4480 |
Size: | 2.95 MB |
Location: | GALVESTON, TEXAS, US |
Web Views: | 8 |
Downloads: | 5 |
This work, USACE Galveston District hydrography team conducts post dredge survey [Image 12 of 12], by Luke Waack, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.