Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    USACE Galveston District hydrography team conducts post dredge survey [Image 5 of 12]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    USACE Galveston District hydrography team conducts post dredge survey

    GALVESTON, TEXAS, UNITED STATES

    06.05.2023

    Photo by Luke Waack 

    U.S. Army Corps of Engineers, Galveston District

    UPPER GALVESTON BAY, Texas (June 5, 2023) Jasper Schaer, Hydro Survey Team, retrieves a GPS sounding tool during a post dredge survey as Jason Hiroms, boat captain observes. Schaer and Hiroms both work for the U.S. Army Corps of Engineers Galveston District. Calibrating sonar instruments to local water quality is an important part of taking accurate measurements during a survey. Sounding measures the speed at which the single beam sonar waves pass through the water. When a large ship passes, it disturbs sediment which slows down the sonar signal. Frequent sounding checks ensure precise measurement of the dredge material removed. U.S. Army photo by Luke Waack.

    IMAGE INFO

    Date Taken: 06.05.2023
    Date Posted: 06.12.2023 16:39
    Photo ID: 7850911
    VIRIN: 230605-A-XJ740-0048
    Resolution: 6720x4480
    Size: 4.76 MB
    Location: GALVESTON, TEXAS, US

    Web Views: 11
    Downloads: 6

    PUBLIC DOMAIN