Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Mountlake Terrace Aquatic Ecosystem Restoration Project [Image 5 of 11]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Mountlake Terrace Aquatic Ecosystem Restoration Project

    MOUNTLAKE TERRACE, WASHINGTON, UNITED STATES

    07.25.2023

    Photo by Nicole Celestine 

    U.S. Army Corps of Engineers, Seattle District

    July 2023 photo of new channel construction in-progress to provide improved in-stream conditions for fish and wildlife at Ballinger Park, Mountlake Terrace, Washington, showing the bank clearing to remove invasive species. As part of the Mountlake Terrace Aquatic Ecosystem Restoration Project, scheduled for completion Spring 2024, this bridge will be removed. The $5.5 million project construction cost, of which $3.4 million comes from Bipartisan Infrastructure Law (BIL) funding that President Joseph R. Biden signed into law in November 2021, includes creating a wetted creek channel, removing invasive plants, and installing a diverse array of plants.

    IMAGE INFO

    Date Taken: 07.25.2023
    Date Posted: 08.02.2023 19:53
    Photo ID: 7948456
    VIRIN: 230725-A-VA654-5651
    Resolution: 1575x2100
    Size: 2.98 MB
    Location: MOUNTLAKE TERRACE, WASHINGTON, US

    Web Views: 12
    Downloads: 3

    PUBLIC DOMAIN