Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Geothermal energy on the way to JBSA [Image 6 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Geothermal energy on the way to JBSA

    JOINT BASE SAN ANTONIO-LACKLAND, TEXAS, UNITED STATES

    11.21.2023

    Photo by Airman 1st Class Gabriel Jones 

    502nd Air Base Wing

    Chris Cheng, Eavor Inc., manager of development engineering, briefs U.S. Air Force Brig. Gen. Russell Driggers, Joint Base San Antonio and 502nd Air Base Wing commander, during the project’s kick-off meeting held at JBSA-Lackland, Texas, Nov. 21, 2023. Cheng is part of the team awarded the contract to evaluate the potential to extract thermal energy through a closed-loop system at JSBA. When operational, the geothermal prototype at JBSA has the potential to furnish a seamless supply of clean, reliable baseload energy even in the event of commercial-grid outages. (U.S. Air Force photo by Airman 1st Class Gabriel Jones)

    IMAGE INFO

    Date Taken: 11.21.2023
    Date Posted: 11.27.2023 13:19
    Photo ID: 8136919
    VIRIN: 231121-F-QK189-1330
    Resolution: 7623x5082
    Size: 2.44 MB
    Location: JOINT BASE SAN ANTONIO-LACKLAND, TEXAS, US

    Web Views: 18
    Downloads: 2

    PUBLIC DOMAIN