U.S. Air Force Staff Sgt. Sean Kirby, 554th Red Horse Squadron emergency management contingency instructor, uses a plate tamper to compact soil for AM-2 mat installation at Northwest Field, Andersen Air Force Base, Guam, Feb. 6, 2024. AM-2 matting form portable runways, taxiways, and parking for aircraft, enabling the resilience of a wide range of air operations in contested or austere environments. (U.S. Air Force photo by Senior Airman Tylir Meyer)
Date Taken: | 02.06.2024 |
Date Posted: | 02.10.2024 23:17 |
Photo ID: | 8235233 |
VIRIN: | 240206-F-VQ804-1127 |
Resolution: | 4561x3035 |
Size: | 7.17 MB |
Location: | ANDERSEN AIR FORCE BASE, GU |
Web Views: | 40 |
Downloads: | 4 |
This work, Cope North 24: U.S., RCAF engineers install AM-2 matting [Image 10 of 10], by SrA Tylir Meyer, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.