Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Cope North 24: U.S., RCAF engineers install AM-2 matting [Image 6 of 10]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Cope North 24: U.S., RCAF engineers install AM-2 matting

    ANDERSEN AIR FORCE BASE, GUAM

    02.06.2024

    Photo by Senior Airman Tylir Meyer 

    Pacific Air Forces

    U.S. Navy EOCA Pete Morrissey, Naval Mobile Construction Battalion 133, bores a hole to secure AM-2 matting installation at Northwest Field, Andersen Air Force Base, Guam, Feb. 6, 2024. AM-2 matting form portable runways, taxiways, and parking for aircraft, enabling the resilience of a wide range of air operations in contested or austere environments. (U.S. Air Force photo by Senior Airman Tylir Meyer)

    IMAGE INFO

    Date Taken: 02.06.2024
    Date Posted: 02.10.2024 23:17
    Photo ID: 8235236
    VIRIN: 240206-F-VQ804-1058
    Resolution: 5370x3573
    Size: 8.83 MB
    Location: ANDERSEN AIR FORCE BASE, GU

    Web Views: 31
    Downloads: 3

    PUBLIC DOMAIN