A preliminary sketch of what the constructed wetlands may look like once adapted on Defense Supply Center Columbus. Dry detention basins built in the early 1990s will be adapted into constructed wetlands over the next several years. (Courtesy U.S. Army Corps of Engineers, Louisville District)
Date Taken: | 01.31.2024 |
Date Posted: | 03.13.2024 10:24 |
Photo ID: | 8285460 |
VIRIN: | 240311-D-D0441-1363 |
Resolution: | 1713x1072 |
Size: | 568.46 KB |
Location: | US |
Web Views: | 17 |
Downloads: | 1 |
This work, DOD Legacy Program preliminary design for constructed wetlands on Defense Supply Center Columbus [Image 2 of 2], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.