Contractors assigned to the Hangar One rebuild project sign the final structural beam to be placed inside the facility at Tyndall Air Force Base, Florida, March 13, 2024. The facility cost more than $99 million and is estimated to be completed in early 2026. (U.S. Air Force photo by Venessa Armenta)
Date Taken: | 03.13.2024 |
Date Posted: | 03.15.2024 17:08 |
Photo ID: | 8291661 |
VIRIN: | 240313-F-NF392-1011 |
Resolution: | 7673x5115 |
Size: | 4.13 MB |
Location: | TYNDALL AIR FORCE BASE, FLORIDA, US |
Web Views: | 8 |
Downloads: | 1 |
This work, Building up and topping out Hangar One [Image 9 of 9], by Venessa Armenta, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.