This infographic shows that the area covered by the established Safety Zone is also the area where hearing protection is required during the precision cutting on section 4 of the Francis Scott Key Bridge. A portion of Hawkins Point is included in this zone, and focused efforts will be made to ensure those in the area are prepared for the event.
(Key Bridge Unified Command 2024 graphic)