The remaining north side of the Francis Scott Key Bridge is seen standing above the Patapsco River on May 13, 2024, in Baltimore, Maryland, shortly before the precision cutting event to "section four" of the Francis Scott Key Bridge wreckage resting on the bow of the M/V DALI using small charges. Debris and wreckage removal is ongoing in support of a top priority to safely and efficiently open the Fort McHenry Channel. (U.S. Army Corps of Engineers photo by Thomas I. Deaton)
Date Taken: | 05.13.2024 |
Date Posted: | 05.14.2024 10:48 |
Photo ID: | 8403505 |
VIRIN: | 240513-A-WK509-1023 |
Resolution: | 3200x4800 |
Size: | 6.09 MB |
Location: | BALTIMORE, MARYLAND, US |
Web Views: | 20 |
Downloads: | 3 |
This work, U.S. Army Corps of Engineers leadership conduct media availability following controlled demolition of Francis Scott Key Bridge wreckage [Image 63 of 63], by Thomas Deaton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.