Members of the media prepare for coverage of the precision cutting event to "section four" of the Francis Scott Key Bridge wreckage resting on the bow of the M/V DALI using small charges, May 13, 2024, in Baltimore, Maryland. Debris and wreckage removal is ongoing in support of a top priority to safely and efficiently open the Fort McHenry Channel. (U.S. Army Corps of Engineers photo by Thomas I. Deaton)
Date Taken: | 05.13.2024 |
Date Posted: | 05.14.2024 10:48 |
Photo ID: | 8403508 |
VIRIN: | 240513-A-WK509-1016 |
Resolution: | 7360x4912 |
Size: | 22.11 MB |
Location: | BALTIMORE, MARYLAND, US |
Web Views: | 53 |
Downloads: | 3 |
This work, U.S. Army Corps of Engineers leadership conduct media availability following controlled demolition of Francis Scott Key Bridge wreckage [Image 63 of 63], by Thomas Deaton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.