Col. Estee Pinchasin, U.S. Army Corps of Engineers, Baltimore District Commander, participates in a live media availability near the Port of Baltimore on board the Baltimore District survey vessel CATLETT, during the Francis Scott Key Bridge response, May 31, 2024. The Fort McHenry Federal Channel, which had been blocked in some capacity by the bridge collapse since March 26, was restored to its original operational dimensions of 700 feet wide and 50 feet deep on June 10, 2024, for commercial maritime transit through the Port of Baltimore. (U.S. Army Corps of Engineers photo by Thomas I. Deaton)
Date Taken: | 05.30.2024 |
Date Posted: | 06.20.2024 12:19 |
Photo ID: | 8487882 |
VIRIN: | 240531-A-WK509-1021 |
Resolution: | 7360x4912 |
Size: | 19.28 MB |
Location: | BALTIMORE, MARYLAND, US |
Web Views: | 2 |
Downloads: | 0 |
This work, Baltimore District hosts May 31 media availability as final bridge truss is prepped for removal from shipping channel [Image 31 of 31], by Thomas Deaton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.