Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Baltimore District hosts May 31 media availability as final bridge truss is prepped for removal from shipping channel [Image 31 of 31]

    Baltimore District hosts May 31 media availability as final bridge truss is prepped for removal from shipping channel

    BALTIMORE, MARYLAND, UNITED STATES

    05.30.2024

    Photo by Thomas Deaton 

    U.S. Army Corps of Engineers, Baltimore District   

    Col. Estee Pinchasin, U.S. Army Corps of Engineers, Baltimore District Commander, participates in a live media availability on board the Baltimore District survey vessel CATLETT, during the Francis Scott Key Bridge response, May 31, 2024. In the background, salvage crews with the Unified Command are preparing to lift the final remaining bridge truss from the Fort McHenry Federal Channel, which was shortly thereafter restored to its original operational dimensions of 700 feet wide and 50 feet deep on June 10, 2024, for commercial maritime transit through the Port of Baltimore. (U.S. Army Corps of Engineers photo by Thomas I. Deaton)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 05.30.2024
    Date Posted: 06.20.2024 12:19
    Photo ID: 8487909
    VIRIN: 240531-A-WK509-1096
    Resolution: 7360x4912
    Size: 16.55 MB
    Location: BALTIMORE, MARYLAND, US

    Web Views: 9
    Downloads: 0

    PUBLIC DOMAIN