As part of the hydrology survey plan for the National Mall Flood Mitigation plan, US Army Corps of Engineers survey crew deployed the Z-Boat in the Potomac River on the National Mall. They conducted a shore-to-shore survey from Georgetown to Fort Washington. The Z-Boat can get to the areas that a normal survey vessel cannot. The data collected is sent to the engineers who are currently devising a flood mitigation plan for the Tidal Basin. The data is normally available to the public within 14 days on the E-Hydro site. https://navigation.usace.army.mil/Survey/Hydro/
Date Taken: | 06.26.2024 |
Date Posted: | 07.01.2024 12:16 |
Photo ID: | 8508838 |
VIRIN: | 240626-O-CT696-8562 |
Resolution: | 4463x2093 |
Size: | 8.26 MB |
Location: | WASHINGTON, DISTRICT OF COLUMBIA, US |
Web Views: | 6 |
Downloads: | 2 |
This work, US Army Corps of Engineers, Baltimore District Survey Team Deploys the Z-Boat Navigation Asset [Image 5 of 5], by Jeremy Todd, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.