A look from atop Tuttle Creek Dam on Aug. 23, 2024, where the dewatered outlet channel allowed contractors to work on repairing riprap below the waterline of the downstream banks of the outlet channel.
Date Taken: | 08.23.2024 |
Date Posted: | 09.26.2024 14:27 |
Photo ID: | 8663323 |
VIRIN: | 240823-O-XH798-8519 |
Resolution: | 6000x4000 |
Size: | 4.6 MB |
Location: | US |
Web Views: | 14 |
Downloads: | 2 |
This work, After a 2020 inspection, Tuttle Creek Dam dewaters outlet channel to undergo massive repairs that reduces risk of spillway erosion and downstream flooding [Image 4 of 4], by Lawrence Brooks, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.