Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    : After a 2020 inspection, Tuttle Creek Dam dewaters outlet channel to undergo massive repairs that reduces risk of spillway erosion and downstream flooding [Image 4 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    : After a 2020 inspection, Tuttle Creek Dam dewaters outlet channel to undergo massive repairs that reduces risk of spillway erosion and downstream flooding

    Construction control representative Robert Dye (right) showing other members of the project team a prototype of the riprap and concrete grout to be placed along both downstream banks of the Tuttle Creek Dam outlet channel.

    IMAGE INFO

    Date Taken: 08.23.2024
    Date Posted: 09.26.2024 14:27
    Photo ID: 8663330
    VIRIN: 240823-O-XH798-1386
    Resolution: 6000x4000
    Size: 4.3 MB
    Location: US

    Web Views: 7
    Downloads: 1

    PUBLIC DOMAIN