A contractor welds a pipe in the Central Utility Plant on the site of the Louisville VA Medical Center Oct. 3, 2024.
Date Taken: | 10.03.2024 |
Date Posted: | 10.04.2024 13:04 |
Photo ID: | 8678603 |
VIRIN: | 241003-A-GI410-1014 |
Resolution: | 3000x2000 |
Size: | 1.35 MB |
Location: | LOUISVILLE, KENTUCKY, US |
Web Views: | 5 |
Downloads: | 1 |
This work, Construction continues at the Louisville VA Medical Center Oct. 3 [Image 11 of 11], by Michael Maddox, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.