Maj. Adam Black, deputy G6, 1st Infantry Division (ID), works on baseband equipment inside a Humvee integrated with prototype on-the-move (OTM) network transport equipment, during a command post exercise (CPX) at Fort Riley Kansas on Nov. 13, 2024. The unit will use this Humvee and other vehicle platforms integrated with a variety of commercial network equipment during the Army’s Armored Formation Network OTM Pilot II, to be conducted during the unit’s combat training center (CTC) rotation later in fiscal year 2025. (U.S. Army photo by Amy Walker, Project Manager Tactical Network, PEO C3N, public affairs)
Date Taken: | 11.13.2024 |
Date Posted: | 01.13.2025 17:40 |
Photo ID: | 8829038 |
VIRIN: | 241113-O-WF398-1001 |
Resolution: | 2736x1824 |
Size: | 644.5 KB |
Location: | FORT RILEY, KANSAS, US |
Web Views: | 29 |
Downloads: | 1 |
This work, Army preps for second phase of Armored Formation Network On The Move Pilot [Image 5 of 5], by Amy Walker, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.