A diverse team of engineers, maintenance and operations crews from both the St. Louis District and Rock Island District finalize temporary repairs made to a Lock and Dam 25 anchor arm.
Date Taken: | 12.17.2024 |
Date Posted: | 01.14.2025 16:02 |
Photo ID: | 8830304 |
VIRIN: | 241218-A-GI418-1023 |
Resolution: | 6720x4480 |
Size: | 4.79 MB |
Location: | WINFIELD, MISSOURI, US |
Web Views: | 2 |
Downloads: | 1 |
This work, Final Tighten [Image 25 of 25], by Aaron Berogan, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.