Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    First GBU-39s loaded on MQ-9 Dual-Carriage System [Image 22 of 23]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    First GBU-39s loaded on MQ-9 Dual-Carriage System

    CREECH AIR FORCE BASE, NEVADA, UNITED STATES

    03.12.2025

    Photo by Senior Airman Ariel OShea 

    432nd Wing   

    Two GBU-39s with red coverings are prepared for loading on an MQ-9 Reaper on the flightline at Creech Air Force Base, Nevada, Mar. 12, 2025. In collaboration with Air Combat Command and the 556th Test and Evaluation Squadron, the 432nd Maintenance Group Weapons Standardization team loaded the first GBU-39, Small Diameter Bombs on the Dual Carriage System--the MQ-9’s newest weapons employment dispenser system. (U.S. Air Force photo by Senior Airman Ariel O'Shea)

    IMAGE INFO

    Date Taken: 03.12.2025
    Date Posted: 03.21.2025 18:29
    Photo ID: 8927298
    VIRIN: 250312-F-IU083-1004
    Resolution: 7952x5304
    Size: 12.73 MB
    Location: CREECH AIR FORCE BASE, NEVADA, US

    Web Views: 15
    Downloads: 0

    PUBLIC DOMAIN