U.S. Air Force Airmen assigned to the 432nd Maintenance Group load a GBU-39 on an MQ-9 Reaper at Creech Air Force Base, Nevada, Mar. 12, 2025. In collaboration with Air Combat Command and the 556th Test and Evaluation Squadron, the 432nd Maintenance Group Weapons Standardization team loaded the first GBU-39, Small Diameter Bombs on the Dual Carriage System--the MQ-9’s newest weapons employment dispenser system. (U.S. Air Force photo by Senior Airman Ariel O'Shea)
Date Taken: | 03.12.2025 |
Date Posted: | 03.21.2025 18:28 |
Photo ID: | 8927299 |
VIRIN: | 250312-F-IU083-1093 |
Resolution: | 7952x5304 |
Size: | 24.07 MB |
Location: | CREECH AIR FORCE BASE, NEVADA, US |
Web Views: | 14 |
Downloads: | 0 |
This work, First GBU-39s loaded on MQ-9 Dual-Carriage System [Image 23 of 23], by SrA Ariel OShea, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.