Heavy equipment removes material to degrade the levee at Segment B during Phase 3 of the Marysville Ring Levee construction, Marysville, Calif., April 12, 2023. Levee degradation is a key step before reconstruction to improve long-term flood risk reduction.
Date Taken: | 04.12.2023 |
Date Posted: | 03.27.2025 21:32 |
Photo ID: | 8940342 |
VIRIN: | 230412-A-A1419-1001 |
Resolution: | 2016x1512 |
Size: | 595.19 KB |
Location: | MARYSVILLE, CALIFORNIA, US |
Web Views: | 6 |
Downloads: | 0 |
This work, Marysville Ring Levee – Segment B Phase 3 Degrade [Image 16 of 16], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.