A trench is excavated and prepared for cutoff wall installation during Phase 3 of the Marysville Ring Levee construction, Marysville, Calif., Oct. 4, 2021. Cutoff walls reduce underseepage through the levee foundation, enhancing flood risk reduction for the area.
Date Taken: | 10.04.2021 |
Date Posted: | 03.27.2025 21:32 |
Photo ID: | 8940344 |
VIRIN: | 211004-A-A1419-1001 |
Resolution: | 2016x1512 |
Size: | 807.87 KB |
Location: | MARYSVILLE, CALIFORNIA, US |
Web Views: | 2 |
Downloads: | 0 |
This work, Marysville Ring Levee – Phase 3 Cutoff Wall Construction [Image 16 of 16], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.