Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Melvin Price Locks and Dam Lift Gate Replacement Project [Image 2 of 11]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Melvin Price Locks and Dam Lift Gate Replacement Project

    ST. LOUIS, MISSOURI, UNITED STATES

    02.14.2025

    Photo by Janet Meredith 

    U.S. Army Corps of Engineers, St. Louis District - MVS

    After removal from the Melvin Price Locks and Dam, the original sections of the three-leaf lift gate await disposal at the Maple Island Access in West Alton, Missouri. The original three-leaf lift gate endured a global twist along with extensive fatigue cracking and was deemed unrepairable. A modern two-leaf gate system replaced these gates during a consolidated lock closure. Melvin Price Locks and Dam is a 1,160-foot-long dam structure equipped with a 1200-foot lock chamber and a 600-foot lock chamber, nine Tainter gates and an emergency spillway.

    IMAGE INFO

    Date Taken: 02.14.2025
    Date Posted: 04.15.2025 11:13
    Photo ID: 8974610
    VIRIN: 250214-A-KR238-1235
    Resolution: 6000x4000
    Size: 7.06 MB
    Location: ST. LOUIS, MISSOURI, US

    Web Views: 8
    Downloads: 0

    PUBLIC DOMAIN