Public Works Department (PWD) Great Lakes engineering technicians Nate White and Susan Geer supervise the installation of a 200-foot wind testing tower at Naval Station Great Lakes, Ill. Anemometers on the tower will collect weather data over the course of a year to determine the feasibility and economic viability of installing wind turbines for electric production at the base. The testing is being performed under a contract issued by the Naval Facilities Engineering Service Center in partnership with the Idaho National Laboratory, under the oversight of PWD Great Lakes. (U.S. Navy photo by Bill Couch/Released)
Date Taken: | 08.12.2009 |
Date Posted: | 10.02.2014 00:44 |
Photo ID: | 1577778 |
VIRIN: | 090812-N-HA320-011 |
Resolution: | 2731x2185 |
Size: | 4.28 MB |
Location: | GREAT LAKES, ILLINOIS, US |
Web Views: | 11 |
Downloads: | 3 |
This work, Tower installation [Image 48 of 48], by William Couch, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.