Fresh bottles of drinking water travel through a conveyor in various stages of the capping process at the new Oasis International Waters, Inc., water bottling plant here. The new plant will produce 200,000 to 450,000 bottles of drinking water daily.
Date Taken: | 05.01.2006 |
Date Posted: | 05.01.2006 12:51 |
Photo ID: | 19068 |
Resolution: | 1918x1250 |
Size: | 1.41 MB |
Location: | BAGHDAD, IQ |
Web Views: | 376 |
Downloads: | 62 |
This work, New water [Image 184 of 184], by SSG Kevin Lovel, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.