Steel workers maneuver a steel beam into place on the bay door pocket of Hangar 1124, April 30, 2015, at McConnell Air Force Base, Kan. In preparation for the KC-46A Pegasus, 16 construction projects totaling $276 million are scheduled for completion by the end of 2018. McConnell AFB is scheduled to receive its first KC-46A in August 2016. (U.S. Air Force photo by Staff Sgt. Rachel Waller)
Date Taken: | 04.30.2015 |
Date Posted: | 05.01.2015 17:06 |
Photo ID: | 1909502 |
VIRIN: | 150430-F-BX362-117 |
Resolution: | 2902x2194 |
Size: | 3 MB |
Location: | MCCONNELL AIR FORCE BASE, KANSAS, US |
Web Views: | 22 |
Downloads: | 3 |
This work, KC-46A Pegasus construction continues [Image 4 of 4], by MSgt Rachel Waller, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.