160516-N-UV609-094
PORTSMOUTH, Va. (May 16, 2016) Ensign Luis Martinez briefs Sailors before beginning a barricade drill on the flight deck of the aircraft carrier USS George H.W. Bush (CVN 77). GHWB is undergoing a planned incremental availability period at Norfolk Naval Shipyard. (U.S. Navy photo by Mass Communication Specialist Seaman David Mora Jr./Released)
Date Taken: | 05.16.2016 |
Date Posted: | 05.18.2016 00:10 |
Photo ID: | 2595799 |
VIRIN: | 160516-N-UV609-094 |
Resolution: | 4256x2680 |
Size: | 1.29 MB |
Location: | PORTSMOUTH, N/A, US |
Web Views: | 8 |
Downloads: | 29 |
This work, GHWB is undergoing a planned incremental availability period at Norfolk Naval Shipyard. [Image 458 of 458], by CPO David Mora, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
No keywords found.