Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    After three-decades, Blue River Corridor flood risk management project complete [Image 2 of 3]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    After three-decades, Blue River Corridor flood risk management project complete

    KANSAS CITY, MISSOURI, UNITED STATES

    07.14.2016

    Courtesy Photo

    U.S. Army Corps of Engineers, Kansas City District

    A typical view of the channel looking upstream from one of the rock grade control structures. Natural channel conditions and adjoining habitat areas were preserved with minimal disruption.

    IMAGE INFO

    Date Taken: 07.14.2016
    Date Posted: 09.14.2016 10:49
    Photo ID: 2852907
    VIRIN: 160714-A-CE999-005
    Resolution: 800x597
    Size: 436.11 KB
    Location: KANSAS CITY, MISSOURI, US

    Web Views: 15
    Downloads: 2

    PUBLIC DOMAIN