A typical view of the channel looking upstream from one of the rock grade control structures. Natural channel conditions and adjoining habitat areas were preserved with minimal disruption.
Date Taken: | 07.14.2016 |
Date Posted: | 09.14.2016 10:49 |
Photo ID: | 2852907 |
VIRIN: | 160714-A-CE999-005 |
Resolution: | 800x597 |
Size: | 436.11 KB |
Location: | KANSAS CITY, MISSOURI, US |
Web Views: | 15 |
Downloads: | 2 |
This work, After three-decades, Blue River Corridor flood risk management project complete [Image 3 of 3], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.