Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    After three-decades, Blue River Corridor flood risk management project complete [Image 3 of 3]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    After three-decades, Blue River Corridor flood risk management project complete

    KANSAS CITY, MISSOURI, UNITED STATES

    07.14.2016

    Courtesy Photo

    U.S. Army Corps of Engineers, Kansas City District

    An aerial view of the lower six miles of the completed channel. The project provides a hydraulically efficient channel of 35,000 cubic feet per second capacity to move water through this industrialized corridor and significantly reduces the threat of flooding to the entire valley.

    IMAGE INFO

    Date Taken: 07.14.2016
    Date Posted: 09.14.2016 10:49
    Photo ID: 2852910
    VIRIN: 160714-A-CE999-002
    Resolution: 512x512
    Size: 116.55 KB
    Location: KANSAS CITY, MISSOURI, US

    Web Views: 39
    Downloads: 2

    PUBLIC DOMAIN