160920-N-VK873-211 ATLANTIC OCEAN (Sept. 20, 2016) Electrician's Mate (Nuclear) 3rd Class Parker Connelly inspects his firefighting ensemble in preparation for General Quarters drill aboard the aircraft carrier USS George H.W. Bush (CVN 77). GHWB is currently conducting Tailored Ship's Training Availability and Final Evaluation Problem (TSTA/FEP). TSTA prepares the ship and crew for full integration into a carrier strike group through a wide range of mission-critical operations and is assessed by Afloat Training Group Norfolk. (U.S. Navy photo by Mass Communication Specialist 3rd Class Kayla King/Released)
Date Taken: | 09.20.2016 |
Date Posted: | 09.24.2016 00:05 |
Photo ID: | 2876787 |
VIRIN: | 160920-N-VK873-211 |
Resolution: | 1639x1939 |
Size: | 474.53 KB |
Location: | USS GEORGE H.W. BUSH, N/A, US |
Web Views: | 9 |
Downloads: | 13 |
This work, the aircraft carrier USS George H.W. Bush (CVN 77). GHWB is currently conducting Tailored Ship's Training Availability and Final Evaluation Problem (TSTA/FEP). TSTA prepares the ship and crew for full integration into a carrier strike group through a wide [Image 182 of 182], by Kayla Cosby, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.