160925-N-GI441-094 ATLANTIC OCEAN (Sept. 25, 2016) Sailors wash the flight deck aboard the aircraft carrier USS George H.W. Bush (CVN 77). GHWB is currently conducting Tailored Ship's Training Availability and Final Evaluation Problem (TSTA/FEP). TSTA/FEP prepares the ship and crew for full integration into a carrier strike group through a wide range of mission-critical operations. (U.S. Navy photo by Seaman Brianna Bowens/Released)
Date Taken: | 09.25.2016 |
Date Posted: | 10.04.2016 00:38 |
Photo ID: | 2896250 |
VIRIN: | 160925-N-GI441-094 |
Resolution: | 3200x2562 |
Size: | 1.1 MB |
Location: | USS GEORGE H.W. BUSH, N/A, US |
Web Views: | 3 |
Downloads: | 24 |
This work, The aircraft carrier USS George H.W. Bush (CVN 77). GHWB is underway conducting routine training and qualifications for a 2017 deployment. [Image 413 of 413], by PO3 Brianna Bowens, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
No keywords found.