170518-N-TU932-043
BREMERTON, Washington (May 18, 2017) Sailors use a gantry assembly to reinstall a catapult cylinder on USS John C. Stennis' (CVN 74) flight deck. The catapult cylinder was being reinstalled after a maintenance overhaul. John C. Stennis is conducting a planned incremental availability (PIA) at Puget Sound Naval Shipyard and Intermediate Maintenance Facility, during which the ship is undergoing scheduled maintenance and upgrades. (U.S. Navy photo by Mass Communication Specialist 3rd Class Sierra D. Langdon/ Released)
Date Taken: | 05.18.2017 |
Date Posted: | 05.23.2017 01:24 |
Photo ID: | 3412203 |
VIRIN: | 170518-N-TU932-050 |
Resolution: | 6087x4348 |
Size: | 922.46 KB |
Location: | BREMERTON, WASHINGTON, US |
Web Views: | 15 |
Downloads: | 14 |
This work, 170518-N-TU932-050 [Image 298 of 298], by PO2 Sierra D Langdon, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.