170905-N-ZZ999-002
GUAM (Sept. 5, 2017) Construction Electrician 1st Class Daniel Lehne, a Seabee assigned to Construction Diving Detachment Alfa (CDDA)
of Underwater Construction Team 2 severs a mooring chain with an underwater exothermic cutting rod. CDDA is removing the old mooring chains that previously held the 12,000 foot Big Blue dry dock at Naval Base Guam. CDDA is on the second stop of their six-month deployment, where they are conducting inspection, maintenance, and repair of various underwater and waterfront facilities in support of the Pacific Fleet. (U.S. Navy photo by Construction Mechanic 2nd Class Ben A. McCallum/Released)
Date Taken: | 09.05.2017 |
Date Posted: | 09.16.2017 00:33 |
Photo ID: | 3777260 |
VIRIN: | 170905-N-ZZ999-002 |
Resolution: | 1279x720 |
Size: | 184.4 KB |
Location: | US |
Web Views: | 49 |
Downloads: | 12 |
This work, UCT 2 Cuts Out Big Blue Dry Dock Moorings [Image 154 of 154], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.