Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    UCT 2 Cuts Out Big Blue Dry Dock Moorings [Image 95 of 154]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    UCT 2 Cuts Out Big Blue Dry Dock Moorings

    UNITED STATES

    09.05.2017

    Courtesy Photo

    U.S. Navy           

    170905-N-ZZ999-002
    GUAM (Sept. 5, 2017) Construction Electrician 1st Class Daniel Lehne, a Seabee assigned to Construction Diving Detachment Alfa (CDDA)
    of Underwater Construction Team 2 severs a mooring chain with an underwater exothermic cutting rod. CDDA is removing the old mooring chains that previously held the 12,000 foot Big Blue dry dock at Naval Base Guam. CDDA is on the second stop of their six-month deployment, where they are conducting inspection, maintenance, and repair of various underwater and waterfront facilities in support of the Pacific Fleet. (U.S. Navy photo by Construction Mechanic 2nd Class Ben A. McCallum/Released)

    IMAGE INFO

    Date Taken: 09.05.2017
    Date Posted: 09.16.2017 00:33
    Photo ID: 3777260
    VIRIN: 170905-N-ZZ999-002
    Resolution: 1279x720
    Size: 184.4 KB
    Location: US

    Web Views: 49
    Downloads: 12

    PUBLIC DOMAIN