Excavators move material during the construction of the Cumberland Levee cofferdam in February 2016.
Date Taken: | 02.21.2016 |
Date Posted: | 03.18.2019 14:22 |
Photo ID: | 5187477 |
VIRIN: | 160221-A-IF821-001 |
Resolution: | 5520x3680 |
Size: | 11.36 MB |
Location: | TULSA, OKLAHOMA, US |
Web Views: | 33 |
Downloads: | 2 |
This work, The Cumberland Levee Breach: Causes, solutions and cost savings in the aftermath of the ‘15 Flood [Image 5 of 5], by Preston Chasteen, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.