Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    DOD support to DHS-funded Yuma sector border barrier projects [Image 24 of 24]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    DOD support to DHS-funded Yuma sector border barrier projects

    YUMA, ARIZONA, UNITED STATES

    06.13.2019

    Photo by Sara Goodeyon 

    U.S. Army Corps of Engineers South Atlantic Division

    The border barrier project in Yuma continues with the replacement of existing barrier with steel bollard barrier filled with rebar and concrete. The barriers installed on this section are 30 feet above the ground. Bollards are four inches apart to allow Border Patrol to see through to the other side of the border. Each bollard extends several feet into the ground to counter digging attempts.

    IMAGE INFO

    Date Taken: 06.13.2019
    Date Posted: 06.18.2019 19:17
    Photo ID: 5504919
    VIRIN: 190613-A-VS667-1024
    Resolution: 5472x3648
    Size: 23.1 MB
    Location: YUMA, ARIZONA, US

    Web Views: 26
    Downloads: 9

    PUBLIC DOMAIN