Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Fort Hood Warrior Transition Brigade’s $62 million campus opens [Image 23 of 27]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Fort Hood Warrior Transition Brigade’s $62 million campus opens

    FORT HOOD, TEXAS, UNITED STATES

    06.05.2012

    Photo by Gloria Montgomery 

    CRDAMC-WTB

    Fort Hood’s new Warrior Transition Brigade Complex is a $62 million, 15-acre campus that includes a 30,137 square-foot battalion headquarters, a 15,000 square-foot company headquarters, a 192,000 square-foot 320-person barracks and a 15,000 square-foot Soldiers and Family Assistance Center that includes child-care facilities and a modern playground. The new facility, which held a ribbon-cutting ceremony June 6, improves care for wounded, injured and ill Soldiers and their Families because services are now centrally located and within walking distance. Now WTB Soldiers can work, train and socialize as a group to create tighter bonds that have proven to be helpful in a Soldier’s healing.

    The new barracks, which can house up to 320 Soldiers, include a selection of ADA-compliant rooms with roll-in showers, kitchen counters and desks to accommodate wheel chairs and wheelchair-accessible washer and dryers. Handrails are installed throughout hallways as well as in all private bathrooms.

    All four buildings are eco friendly with design solutions that conserve energy, water efficient and self-sustainable. The buildings have solar panels that provide about 30% of energy used to heat hot water as well as standing seam metal roofs that lower the buildings' solar reflectivity index, which reduces heat and cooling costs. Other energy efficiency enhancements include motion sensing lights, high-efficiency window systems and non-water using urinals that use a biodegradable liquid for sanitary and odor free environment and dual flush toilets will save up to 30 gallons of water. The WT Operations building is LEED Silver Level certified.

    Landscaping considerations include using native trees and grass that are grouped together by similar watering needs and selected for their hardiness, availability and drought tolerance.

    The WT complex, by using durable finishes and efficient systems, is designed for a 25-year life span before renovation. It has an estimated 50-year life span wit

    IMAGE INFO

    Date Taken: 06.05.2012
    Date Posted: 06.06.2012 19:28
    Photo ID: 595447
    VIRIN: 120605-A-0595M-062
    Resolution: 3220x2412
    Size: 3.6 MB
    Location: FORT HOOD, TEXAS, US

    Web Views: 55
    Downloads: 7

    PUBLIC DOMAIN