U.S. Army Engineer Research and Development Center (ERDC), Construction Engineering Research Laboratory (CERL), mechanical engineer and project lead for the Additive Construction Program and 3D Printing Megan Kreiger briefs the Principal Deputy Assistant Secretary of the Army for Installations, Energy and Environment Bryan Gossage at the ERDC Forward Operating Base-Laboratory, in Champaign, Ill., Oct. 30, 2020. Kreiger explained that the “chevron” design of the Barracks Hut construction is 2.5 times stronger than straight 3D printed concrete walls. (U.S. Army Corps of Engineers photo)
Date Taken: | 10.30.2020 |
Date Posted: | 11.06.2020 15:04 |
Photo ID: | 6415594 |
VIRIN: | 201030-A-EN757-2707 |
Resolution: | 5472x3648 |
Size: | 2.67 MB |
Location: | CHAMPAIGN, ILLINOIS, US |
Web Views: | 27 |
Downloads: | 4 |
This work, CERL hosts senior Army installation, energy, environment leadership [Image 11 of 11], by Carmen Daugherty, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.