A surveyor works to ensure concrete being placed as part of a larger Army Prepositioned Stock project being built in Powidz, Poland is placed level March 17, 2022. The APS project involves the construction of a series of humidity-controlled warehouses and other associated facilities to allow for the storage and maintenance of military vehicles and equipment and is the largest project in Poland being managed by the U.S. Army Corps of Engineers, Europe District’s Northern Europe Area Office. (U.S. Army photo by Chris Gardner)
Date Taken: | 03.17.2022 |
Date Posted: | 03.30.2022 05:04 |
Photo ID: | 7111392 |
VIRIN: | 220317-A-WZ074-3147 |
Resolution: | 6016x4016 |
Size: | 12.65 MB |
Location: | POWIDZ, PL |
Web Views: | 78 |
Downloads: | 5 |
This work, U.S. Army Corps of Engineers construction project in Poland will further enhance NATO readiness in region [Image 11 of 11], by Christopher Gardner, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.